POLAR Integrated Solutions answered the call from the Royal Society of Medicine and Electrosonic to overhaul and streamline multiple Biamp installations to work efficiently as a single entity at its 1, Wimpole St facility.
RSM is one of the UK’s leading providers of post-graduate medical education, meaning much of its work revolves around conferences and meetings. High quality AV provision is an essential part of delivering not only the Society’s own activities but also those of other corporate bodies who hire its facilities. External hire accounts for around 40% of activity at the Society’s conferencing rooms, delivering essential revenues that help support its own academic work. Last year the RSM’s technical team made an evaluation of their facilities and concluded that their systems, although all comprising cutting-edge and high quality products, could be deployed much more efficiently.
AV manager Kevin McLoughlin contacted the POLAR Integrated Solutions Team, which, in addition to supplying and distributing products, possesses all the necessary expertise for working in the field to assist with the design and commissioning of AV schemes. After the initial contact, POLAR’s technical support manager Darren Stratford eventually spent two weeks at the RSM’s facilities.
“The RSM has hosted Tesira hardware for a number of years and in the past we’ve directly supported a number of integrators and the end-user in respect of issues surrounding implementation, configuration and fault finding,” he said. “At the heart of the matter was the fact that functionality had been somewhat ‘bolted-on’ to the system over time. The fluidity of its overall configuration had become clouded with additional implementations, rendering it hard to follow and difficult to fault find – even when you’re used to supporting Tesira every day of the week! As more functionality was appended, so the difficulty of obtaining information necessary to rectify problems, increased. We discussed how best to overcome the issues with Kevin and the RSM’s current integrator – it became clear that the system required a complete overhaul in respect of its configuration and topology.”
At the time the RSM was incorporating a new multi-purpose function space, The Max Rayne Atrium, into its facilities, prompting agreement amongst the parties that this was the right moment for a root and branch re-design of the entire system.
“The scope of works that fell under POLAR’s responsibility was to provide an AVB network topology re-design and to re-program, configure and commission the entire system from scratch,” continues Stratford. “This was a real challenge in that there was no real ‘specification’ or ‘required functionality’ document to work from, as is commonly the case. I determined that the best way forward was to sit down with Kevin and his team who use the system every day and really get an understanding of how they use the system, what functionality they would like to retain from the old configuration and the additional functionality they would like to see.”
Unusually for a project such as this, these conversations took place on site as the system was being set up. Darren Stratford recognised that this was somewhat unconventional but the outcomes more than justified the means. He reflected: “It was really beneficial to have an open, honest rapport with the end user about what could realistically be achieved in the timeframe and any inherent limitations that the system may have. The bulk of the programming, re-configuration and commissioning took around two weeks on site, allowing some contingency for wiring/patching issues that were encountered, alongside any time for resolving snags.”
The greatest challenge involved troubleshooting potential networking and patching faults. The AVB network was re-configured from scratch, many of the switches having serious configuration errors within them. Once these were resolved there were problems surrounding what appeared to be LAN uplink traffic being introduced to the AVB network and causing sporadic issues.
“In situations like this it’s always important to understand exactly what is happening on the network at any given time,” explained Stratford. “Dependent on the client, this can sometimes be time consuming without any assistance from network administrators. It’s also a huge potential source for red herrings which can lead you astray. However, working alongside the RSM team I was able to request any specific information we needed and so managed, eventually, to overcome all the issues.”
With its configuration following a much more logical structure, RSM now enjoys a fully functional, single complete system, where previously there had effectively been three independently configured systems and networks. Very positive feedback from its users notes the fact that the system is easier to use and control and that any faults arising are easier to trace. The re-commissioning of the system at the RSM is the perfect illustration of how POLAR’s efforts to form strong relationships with integrators and also significantly, end users, adds a great deal of value to its position as a highly respected distributor.
“The work undertaken by POLAR at the RSM was invaluable,” Kevin McLoughlin summarised. “We were able to have a very constructive on-site dialogue with Darren about the issues we were having and supply any feedback he required to progress. We now have a streamlined system that is straightforward to operate and troubleshoot. There is no doubt that the success of this project reflects the value of our relationship as an end user with POLAR’s integrated solutions team – the work was completed in a comparatively short space of time and the level of Darren’s expertise is amply illustrated by the excellent outcome.”